Figures

Figure 1-1 ftServer System in 38U and 24U Cabinets
Figure 1-2 Three Main Assemblies of an ftServer System
Figure 1-3 CPU Enclosure
Figure 1-4 PCI Console Assembly
Figure 1-5 PCI Console Shelf at the Rear of the System Cabinet
Figure 1-6 Ultra2 SCSI Storage Enclosure
Figure 1-7 Ultra160 SCSI Enclosure, Front
Figure 1-8 Ultra160 SCSI Enclosure, Rear
Figure 1-9 V125 1U Monitor Units
Figure 1-10 V106 Monitor, Keyboard, and Mouse for 38U and 24U Cabinets
Figure 2-1 System CPU Enclosure LEDs
Figure 2-2 Front Panel LEDs, Controls, and Ports
Figure 2-3 Clock Card LEDs
Figure 2-4 I/O Enclosure/Slots Status LEDs
Figure 2-5 PCI Console Power Supply LEDs
Figure 2-6 Ultra2 Storage Enclosure LEDs and Controls (Front View)
Figure 2-7 Ultra2 Storage Enclosure LEDs and Controls (Rear View)
Figure 2-8 Ultra160 SCSI Enclosure and Disk-Drive LEDs
Figure 2-9 Ultra160 SCSI Enclosure LEDs, Rear
Figure 2-10 CSM LEDs
Figure 2-11 V125 Monitor Unit
Figure 2-12 Moving the Keyboard Shelf (V122 Monitor)
Figure 2-13 System Power Strips
Figure 2-14 System Power Button
Figure 3-1 Warning and Error Icons
Figure 4-1 Shipping Impact Indicators
Figure 4-2 Using a Grounding Strap
Figure 4-3 Routing Power Cords and Data Cords
Figure 4-4 Routing CPU-to-PCI Console Cables
Figure 5-1 Opening and Closing a Cabinet's Front Door: Steps 1 and 2
Figure 5-2 Partially Removing a Cabinet Door
Figure 5-3 Removing and Installing a CPU Enclosure Bezel: Step 2
Figure 5-4 Loosening Console Cable Connections, CPU Side
Figure 5-5 Loosening Console Cable Connections, PCI Console Side
Figure 5-6 Connecting the CPU-to-PCI Cable to the PCI Console
Figure 5-7 Lifting the Hold-Down Bracket
Figure 5-8 Removing the CPU Enclosure Front Screws
Figure 5-9 Disconnecting the Power Cord
Figure 5-10 Removing a CPU Enclosure: Step 9
Figure 5-11 Inserting the CPU Enclosure into the Cabinet
Figure 5-12 Reconnecting the Power Cord to the CPU Enclosure
Figure 5-13 Removing/Installing the PCI Console Bezel
Figure 5-14 Removing the Front Panel: Steps 5-7
Figure 5-15 Installing the Front Panel: Steps 2-4
Figure 5-16 I/O Enclosure
Figure 5-17 Removing a Clock Card: Steps 7 and 8
Figure 5-18 Installing a Clock Card: Steps 2 and 3
Figure 5-19 Removing a PCI Console Power Supply: Step 4
Figure 5-20 Removing a PCI Console Power Supply: Steps 5 and 6
Figure 5-21 Installing the PCI Console Power Supply: Steps 1 and 2
Figure 5-22 Installing the PCI Console Power Supply: Step 3
Figure 5-23 Removing an I/O Enclosure: Steps 4 and 5
Figure 5-24 Removing an I/O Enclosure: Steps 6 and 7
Figure 5-25 Installing an I/O Enclosure: Steps 2 and 3
Figure 5-26 Installing an I/O Enclosure: Step 4
Figure 5-27 I/O Enclosure Energy Hazard
Figure 5-28 Removing a PCI Adapter: Step 2
Figure 5-29 Ejecting a Modem Card from an ftServer Access Adapter
Figure 5-30 Removing a PCI Adapter: Step 5
Figure 5-31 Removing a PCI Adapter: Step 6
Figure 5-32 Installing a PCI Adapter: Step 3
Figure 5-33 Installing a PCI Adapter: Step 4
Figure 5-34 Installing a PCI Adapter: Steps 5 and 6
Figure 5-35 Data Cables and the Cable Guide
Figure 5-36 Installing a PCI Adapter: Step 7
Figure 5-37 Split-Bus, Dual-Initiation Configuration (Ultra2)
Figure 5-38 Joined-Bus, Dual-Initiation Configuration (Ultra2)
Figure 5-39 Split-Bus Cabling (Ultra160)
Figure 5-40 Joined-Bus Cabling (Ultra160)
Figure 5-41 Inserting a Filler Bracket Blank: Step 2
Figure 5-42 Removing a SCSI Cable (Ultra2): Steps 5 and 6
Figure 5-43 Installing a SCSI Cable (Ultra2): Steps 1 and 2
Figure 5-44 Removing a Storage Enclosure Fan (Ultra2): Steps 3 and 4
Figure 5-45 Installing an Ultra2 Storage Enclosure Fan: Steps 1 and 2
Figure 5-46 Removing an Ultra2 Storage Enclosure Power Supply: Steps 3-5
Figure 5-47 Installing an Ultra2 Storage Enclosure Power Supply: Steps 1-4
Figure 5-48 Removing a SCSI Cable (Ultra160)
Figure 5-49 Installing a SCSI Cable (Ultra160)
Figure 5-50 Replacing an ACM
Figure 5-51 Removing an Ultra160 Power Supply
Figure 5-52 Removing a CSM or JM
Figure 5-53 Replacing a CSM or JM
Figure 5-54 V125 Monitor Unit Connections
Figure 5-55 Pressing the Stop Buttons
Figure 5-56 Rack-Mounted Monitor (Rear View): Steps 4 and 5
Figure 5-57 Routing the Monitor Power Cord and VGA Cord (Non-V125/V128)
Figure 5-58 Routing the V125/V128 Monitor-Unit Power Cord and VGA Cord
Figure 5-59 Keyboard Cable Routing
Figure 5-60 UPS Converter
Figure 5-61 Power Strip on Customer-Supplied Rack
Figure 5-62 Moving the Power Strip from the Normal Position: Step 2
Figure 5-63 Moving the Power Strip into the Extended Position